(SK-3036) (Presentation Only) Overview of Construction Claims and Disputes

Author(s)/Presenters(s): James G. Zack, Jr. CFCC FAACE Hon. Life

Time/Room: WED 9:15-11:30/Bayside B

Abstract:

This presentation discusses the 11 basic types of construction claims included in most standard contracts used throughout the U.S. – AIA, ConsensusDOCS, EJCDC, etc. It outlines the entitlement and causation elements of each type of claim that the claimant must demonstrate to justify their right to prevail. The presentation highlights the following types of construction claims – claims for directed changes; constructive changes; differing site conditions; directed suspensions of work; constructive suspensions; force majeure events; delays; accelerations; constructive accelerations; terminations for convenience; and, terminations for default. The presentation also identifies several types of owner claims against contractors. The elements of the burden of proof required of all claimants are presented. The basic requirements concerning damages are covered.  A discussion of claims under various project delivery methods and a summary of an accepted claims preparation and analysis methodology are included. The presentation will conclude with an outline of various dispute resolution methodologies.

 

(SK-3059) (Presentation Only) Feng Method and Application Using Power BI

Author(s)/Presenters(s): Steve Feng

Time/Room: TUE 10:15-11:15/Bayside C

Abstract:

The current use of common project controls reports as summary financial statements, CPM Gantt schedules, and earned value charts, have been beneficial for traditional methods of project controls.  These reports require details and precision that often is timely, error prone, and costly to develop. The Feng method is a proposed method of project controls management that focuses on a process to quantify a project as required and otherwise, qualifying other areas in project controls.  The method explains how quantified scope is utilized for faster decision making. 

Today, we have an unlimited compository of data, computer engines capable to return results faster than a blink of an eye, and tools available to everyone.  These technological advances allow us to expand on our current methods to increase accuracy, precision, and time of decision making.  As a follow up to the 2018 AACE presentation, Power BI, we will continue the track with review of intermediate level features and explain the application of the Feng method.

 